| 0 comments ]

www.noidaauthorityonline.com , noida authority online, noida, noida authority, noida development authority, New Okhla Industrial Development Authority


The NOIDA authority is now scheduled to take out fresh draw for 1, 2500 plots which were scheduled for draw in 2004. New Okhla Industrial Development Authority's Scheme 2004 (1),was countermanded in July, 2005 due to massive rigging in draw results.

The NOIDA authority will hold the draw for flats from November 5 to November 8 in the Noida Stadium at 8 am on all the four days. The draw will be carried out manually unlike the last timw when it was done through computer. Heavy rigging was reported in the computerized draw for these plots and the Allahabad High Court intervened to order a manual draw. The High Court also gave detailed instructions on how the manual plot draw will be carried out.

0 comments

Post a Comment